To get Live updates on Pune's Real Estate Market Follow us on
e-park
e-park , Sprawling over 70,000 sq-ft of land, this IT & IT-es project at MIDC Knowledge Park, Kharadi.
About e-park
Development details: Total built-up area of 0.4 million sq. ft. in twin blocks with central bifurcated service core.
Width of the access road: 30 mts.
Levels: Lower Ground, Ground, 5 Floors
Floor Plate Area: 70000 sqft.
Space Efficiency: 80%
Power Back-up: 100% Power Back-up
Fire Protection: As per NBC Code
Design USPs
At Master Planning level
Creation of the entire project as a complete solution for the user and visitor, by creating state-of-the-art working conditions.
Site parking and circulation layouts prepared keeping in mind future occupational levels, triple-shift usage, peak-hour traffic and the various differences in traffic flow from different types of offices.
At building design level
Services within the building provided to be used for either individual occupancy of Multi-tenancy.
Building services have been designed to cater to various office typologies, from data centers to software and call center scenarios.
Buildings have been designed to cater to seamless high-speed connectivity with Fiber-Optic backbone.
Flexibility in floor space with a high floor plate efficiency.
Fire provisions as per NBC norms, specifically for the most stringent of MNC requirements.
Building design incorporates an extremely flexible but selectively permeable access control at various levels, including turnstiles at lobby levels and provision for proximity readers and card sensors at all entries and exit points as part of intelligent Building Management Service being provided for the project.
Floor plates of 30000 and 40000 sqft combinable to 70000 sqft.
Provision of five 16 person high speed synchronized elevators for most efficient vertical movement of users.
Ample and efficient parking floors at basement, ground and podium levels.
Services located unobtrusively in basements, with the essential air conditioning and electrical high-side components juxtaposed within in a dedicated utility block enables full functionality from day 1 of occupancy, without any downtime.
Parking @ 1 car per 700 sqft of leasable space achieved with an automated puzzle parking system.